济南这边做机电项目,桥架本体大家都会盯板厚、锌层、跨距,但真到安装队进场,非常容易出岔子的反而是弯通、三通、变径这些“转角件”。不少工地图快,直段不够就拿切割机现场开斜口、拼角焊一下,看着能装上,隐患全埋在拐角里。
In Jinan, when it comes to mechanical and electrical projects, everyone pays attention to the thickness, zinc layer, and span of the bridge body. However, when the installation team enters the site, the most likely to make mistakes are the "corner pieces" such as bends, tees, and reducers. Many work maps are fast, but if the straight section is not enough, they use a cutting machine to cut the diagonal and weld the corners on site. It looks like they can be installed, but the hidden dangers are all buried in the corners.
先说为什么不能随便剪。桥架转弯处的内侧弯曲半径建议大于里面非常粗那根电缆的非常小允许弯曲半径——动力缆一般按外径 10~12 倍留,控制缆 6~10 倍。 现场手工剪出来的斜接角,半径往往不够,电缆硬拽过去,外护套当时没破,运行几个月热胀冷缩一磨,绝缘层就出内伤。
Let's first explain why we can't just cut it casually. The inner bending radius of the bridge bend must be greater than the minimum allowable bending radius of the thickest cable inside - power cables are generally reserved at 10-12 times the outer diameter, while control cables are reserved at 6-10 times. The diagonal joint angle manually cut on site often has insufficient radius, and the cable is forcibly pulled over. The outer sheath was not broken at that time, and after running for several months, the insulation layer suffered internal damage due to thermal expansion and contraction.

再说毛刺。切割口不打磨,镀锌层断面直接露铁,毛刺像刀片一样朝着电缆。验收时肉眼不一定看全,送电后振动一蹭就是隐患。正规做法是:切完建议去毛刺、断面补富锌漆,非常好直接用成品弯通。
Speaking of burrs. The cutting edge is not polished, and the galvanized layer section is directly exposed to the iron, with burrs facing the cable like blades. During acceptance, the naked eye may not be able to see everything, and a slight vibration after power transmission is a hidden danger. The standard practice is to remove burrs and apply zinc rich paint to the cut surface, preferably by directly bending the finished product.
第三是接地连续性断了。直段靠连接板+防松螺栓导通,可现场拼的斜角如果两边涂层没刮、跨接线没补,这一段就成了“电的孤岛”。非镀锌桥架拐角处尤其要补 ≥4mm² 铜软线跨接,不然全段接地电阻一测就飘。
The third is that the grounding continuity is broken. The straight section is connected by a connecting plate and anti loosening bolts, but if the coating on both sides is not scraped or the jumper wire is not repaired, this section becomes an "electrical island". At the corners of non galvanized cable trays, it is especially necessary to add ≥ 4mm ² copper flexible wire jumper, otherwise the grounding resistance of the entire section will float when measured.
还有变径和分支。主桥 400 变 200,别拿大板现场折个台阶;三通、四通用成品件,接口处两侧 300~600mm 内各加一道支吊架,否则拐点先塌腰。
There are also variations in diameter and branching. Change the main bridge from 400 to 200, don't take the large board and fold a step on site; Three way and four universal finished products, add one support hanger on each side of the interface within 300-600mm, otherwise the inflection point will collapse first.
给济南项目现场一句实在话:直段可以比价,转角别省事。询盘时把“弯通/三通/变径/水平弯/垂直弯”单独列清单,让厂家按图配成品;到货先摸拐角内弧有没有毛刺、有没有补漆、跨接孔留没留。桥架整条线的质量,往往就卡在那几个弯上。
A practical sentence for the Jinan project site: straight sections can be compared, but corners can be more convenient. When making inquiries, please provide a separate list of "bends/tees/reducers/horizontal bends/vertical bends" and have the manufacturer prepare the finished products according to the drawings; Upon arrival, first check for any burrs on the inner arc of the corner, whether there is any repainting, and whether there are any bridging holes left. The quality of the entire cable tray line is often stuck in those few bends.